Archi Quote Compare

Get your new-build house structurally designed, foundations to roof

New brick house under construction with roof trusses on the walls, scaffold, a tower crane and a skip on site

For self-builders, developers and homeowners building a new house. Describe your plot and plans, then compare quotes from structural engineers who can design the structure from the foundations up to the roof.

A new house needs its structure designed from the ground up. A structural engineer works out what the ground can support and designs the foundations and ground floor, then the walls, upper floors, roof and any steel beams or lintels (the beams over doors and windows), so every load has a clear path down to the soil. They also check that the house stays stable in wind, and coordinate with your designer’s plans, the roof truss and floor suppliers and the drainage layout. The result is a set of calculations and drawings that building control can approve and your builder can price and build from. Good design is settled before the groundworks begin, because foundations are very hard to change once the concrete is in.

How a professional can help

Is this right for you?

How the project usually runs

What affects the cost

Approvals for a new house across the UK

Questions people ask

Do I need a structural engineer for a new house?

Usually, yes. Building control will normally expect structural calculations and drawings for the foundations, beams, floors and roof. Some parts, such as roof trusses or a timber frame, are designed by suppliers, but someone still needs to design the foundations and supports they rely on. Your engineer can explain who designs what.

When should I appoint the engineer?

As soon as your layout is fairly settled, and ideally before the plans go to building control or the groundworks are priced. Early involvement helps because spans, openings and ground conditions all affect the design, and changing foundations once work has started is difficult and disruptive.

Does the engineer design the roof trusses?

Usually the truss manufacturer designs and supplies the trusses to a layout based on your plans. The engineer designs the walls and steel beams they bear on and checks details such as bracing and fixings where needed. Agree at the start which parts are supplier design, so nothing falls between the two.

What happens if I change the layout after the structure is designed?

Changes to walls, openings or room sizes usually mean changes to beams, loads and sometimes the foundations. Tell your engineer before you order trusses, steel or precast floors, because those are made to the design. Small changes are often quick to check. Changes made after the steel is ordered or the foundations are dug are much harder to deal with.

Can the foundations be designed before everything else?

Often, yes. Foundations depend on the loads from the walls above, so the layout needs to be fairly settled. Once it is, the engineer can issue the foundation drawings first, so groundworkers can be booked while the floors, roof and steel are finished. Check with building control what must be approved before digging starts.

Available across the UK

Professionals cover the whole of the UK: England, Scotland, Wales and Northern Ireland. Planning and Building Regulations differ between the four nations, and your professional will work to the rules that apply where your property is.