Archi Quote Compare

Move your staircase or open up a void with the floor properly supported

Floor plan drawing with a stair opening cut between joists, doubled trimmer joists in teal and a new staircase beside it

For owners moving a staircase, opening up a double-height space or adding a floor hatch. Describe your floors and compare quotes from structural engineers who design the framing, beams and supports around the cut.

A floor is a structural part of the house: its joists carry loads to the walls, and it helps hold those walls in position. Cutting a hole for a staircase or a double-height void (a space open through two floors) removes part of that, and the joists that were cut need new support around the opening. A structural engineer designs the framing, from a cross-beam called a trimmer and doubled joists to steel beams, checks what is standing on the floor above, and considers what a large void does to the walls beside it. You receive calculations and drawings for building control and your builder.

How a professional can help

Is this right for you?

How the project usually runs

What affects the cost

Building control, fire safety and approvals for new openings

Questions people ask

Do I need an engineer to move a staircase?

If it means cutting into a floor, in most cases yes. The new opening cuts joists that carried load, and a badly framed hole can lead to sagging floors and cracked ceilings. An engineer checks the framing and what stands above the opening, and building control will usually expect calculations.

Can I just frame the opening with doubled joists?

Sometimes, for a small opening in a lightly loaded floor. But if the trimmer has to carry many joists, or a wall sits above the opening, doubled timbers may not be enough and a steel beam is needed. The engineer checks the loads and tells you which applies, so don’t cut any joists until the framing has been agreed.

What is a trimmer?

A trimmer is a beam placed across the opening to take the ends of the joists that were cut. The joists either side of the opening that carry the trimmer are usually doubled. Together they form a frame that passes the load around the hole to the walls or beams at each end.

How does a double-height void affect my walls?

Floors help hold walls in place, so removing a floor leaves the wall unsupported over a greater height. Brick and block walls can cope with this up to a point, but taller, thinner walls may need steel posts, ties or beams. The engineer checks the walls on either side and tells you what is needed.

Can I cut a stair opening in a concrete floor?

Possibly, but not before finding out how the slab is reinforced and how it spans. Concrete floors in flats or new-builds can carry load in specific directions, and cutting through reinforcement without a design can weaken them. Some slabs also contain tensioned steel cables, which must not be cut or drilled without specialist advice. The engineer checks first, often from the original drawings or with a scan, and may specify support around the opening.

Available across the UK

Professionals cover the whole of the UK: England, Scotland, Wales and Northern Ireland. Planning and Building Regulations differ between the four nations, and your professional will work to the rules that apply where your property is.