A whole-house renovation planned properly from the start

Brick house mid-renovation with scaffold on one side, a new roof section, solar panels, a skip and a pallet of materials

For owners of older, tired or newly bought homes planning a full refurbishment. Compare quotes from professionals who can survey the house, set priorities, design the changes and coordinate approvals and builders.

A whole-house renovation usually touches everything: layout, roof, windows, damp, wiring, plumbing, heating, insulation and finishes, sometimes with an extension or loft conversion added. Doing it as one planned project is usually more efficient than tackling rooms piecemeal, because services, structure and energy improvements can be designed together and the messy work done once. A good professional starts by understanding the building’s condition and construction, helps you decide what matters most and what can wait, designs the changes, and puts together information builders can price fairly. With older homes, they also make sure upgrades such as insulation suit the way the building was built, so you don’t create damp problems.

How a professional can help

Is this right for you?

How the project usually runs

What affects the cost

Consents to check for a full renovation

Questions people ask

Where should I start with a whole-house renovation?

Start with the building’s condition, not the kitchen. A survey shows what needs repairing and which services need replacing, and that shapes the budget and the order of work. From there a professional can help you set priorities, design the changes and decide whether to do everything at once or in phases.

Should I renovate all at once or in phases?

Doing it at once usually means less disruption overall, and the messy work, such as rewiring, replumbing and plastering, is done only once. Phasing can suit your budget or let you stay in the house, but it needs a plan so early work isn’t undone later. Your professional can sequence the phases so each one leaves the house usable.

Do I need planning permission to renovate my house?

Most internal renovation and like-for-like repairs don’t need planning permission. Extensions, loft dormers, changes to the outside and work in conservation areas or to listed buildings may need consent, and rules differ between the UK nations. Building Regulations are a separate matter and apply to much of the work in a typical renovation.

How do I avoid causing damp when I insulate an older house?

Older homes with solid walls often rely on moisture being able to escape. Some modern insulation, renders and paints can trap that moisture and lead to damp or decay. A professional who understands traditional construction can choose suitable materials, plan ventilation alongside insulation, and deal with existing causes of damp, such as poor gutters or high ground levels, first.

Is there any VAT relief for renovating an empty home?

Work on a home that has been empty for a long period may qualify for a reduced rate of VAT, and some conversions have their own reliefs. The conditions are specific and the builder has to apply them correctly, so check the current HMRC guidance or ask an accountant before you rely on it in your budget.

Should I worry about asbestos?

Homes built or refurbished before asbestos was banned in the UK can contain it in places such as ceilings, floor tiles, pipe lagging and boxing. Before strip-out, ask whether an asbestos survey is needed so any material can be identified and dealt with safely by the right contractor.

Available across the UK

Professionals cover the whole of the UK: England, Scotland, Wales and Northern Ireland. Planning and Building Regulations differ between the four nations, and your professional will work to the rules that apply where your property is.