Archi Quote Compare

Get the right ground floor slab for your extension or new build

Cutaway of a new ground floor slab with steel reinforcement, insulation and hardcore between two cavity walls, with an engineer

For people building an extension, outbuilding or new home who need the floor structure designed. Tell us about the project and compare quotes from structural engineers who design slabs, beam-and-block and other suspended floors.

The ground floor is more than a layer of concrete. It carries the walls, furniture and people above it, keeps damp from the ground out and holds the insulation that stops heat escaping. The right type depends on the ground. A slab can sit directly on compacted hardcore (broken stone or brick) where the soil is firm and level, while soft, filled or clay ground that moves with trees often calls for a floor that spans above a void. A structural engineer chooses between them, then designs the thickness, reinforcement and wall details so the floor works with the foundations and lines up with the existing house.

How a professional can help

Is this right for you?

How the project usually runs

What affects the cost

Building control, insulation rules and the UK nations

Questions people ask

What is the difference between a ground-bearing slab and beam-and-block?

A ground-bearing slab is concrete cast on compacted fill, resting directly on the ground. Beam-and-block uses precast concrete beams and infill blocks that span between walls, leaving a void beneath. Slabs suit firm ground, while beam-and-block is often used where the ground may move or the fill is deep. Your engineer will recommend one.

Do I need a structural engineer for an extension floor?

Not always for a very simple floor on good ground, as building control may accept a standard design. But clay, trees, deep fill, heavy loads or a link to an old floor are all reasons to have the floor designed. Building control or your warranty provider can say what they accept.

Can I have underfloor heating in a slab?

Yes, it is commonly done, with pipes in a screed above the insulation. It affects the floor thickness and the finished level, so tell your engineer and designer early. The insulation and screed need to be detailed together so the floor ends up level with the rest of the house.

Can the concrete be poured straight onto the ground?

Not without preparation. Topsoil and vegetation are removed, the ground is levelled and a layer of compacted hardcore is laid, topped with a damp-proof membrane and insulation. If the ground is soft or the fill is deep, a suspended floor may be required instead. Skipping these steps can lead to damp and cracking.

Who checks the floor on site?

Building control inspects key stages, including the preparation of the ground and the reinforcement, before concrete goes in. Your engineer can also inspect if you ask. The hidden parts of a floor cannot easily be checked once covered, so arrange inspections before pouring.

Available across the UK

Professionals cover the whole of the UK: England, Scotland, Wales and Northern Ireland. Planning and Building Regulations differ between the four nations, and your professional will work to the rules that apply where your property is.