Prior approval for larger extensions, barns and commercial conversions
For homeowners, farmers and property owners in England using permitted development rights that need the council’s prior approval first. Compare quotes from professionals who check eligibility and prepare the application.
Some permitted development rights in England carry a condition: before you build, the council must decide whether its prior approval is needed on specific matters. Common examples are a larger single-storey rear extension under the neighbour consultation scheme, adding storeys to a house, converting an agricultural building to homes under Class Q, and turning commercial premises into flats under Class MA. The council can only assess the listed matters, such as transport, noise, flooding, natural light or the impact on neighbours, not the wider planning merits. That makes eligibility vital: if the building or proposal doesn’t meet every condition of the right, prior approval can’t fix it. A good professional checks this first, then prepares evidence for each matter.
How a professional can help
- Checking the right actually applies: They confirm the property qualifies for the class you want to use, looking for removed rights, protected land, listed status and each size limit and condition in the rules.
- Larger home extensions: For a deeper single-storey rear extension, they prepare the notification with accurate dimensions and plans, designing with the adjoining neighbours’ outlook and light in mind, since they’ll be notified and can object.
- Class Q barn conversions: They check the building’s agricultural use and whether it can be converted without effectively being rebuilt, often with a structural survey, then address transport, noise, flooding and design.
- Class MA commercial to residential: They test whether the building’s use qualifies, then prepare layouts that meet nationally described space standards with natural light to every habitable room, plus noise, flood and transport evidence.
- Answering the council’s questions: During the determination period they deal with consultee responses and neighbour comments, keeping the discussion focused on the matters the council is allowed to consider.
Is this right for you?
- You want a deeper single-storey rear extension in England than standard permitted development allows, without a full planning application.
- You own an agricultural building and want to explore converting it into one or more homes.
- You own an office, shop or other commercial building in England and are considering converting it to flats.
- You’ve been told your project needs prior approval or a prior notification and aren’t sure what to submit.
How the project usually runs
- Eligibility check: A professional reviews the property, its planning history and any restrictions, and confirms which permitted development class applies and whether the proposal meets every limit and condition.
- Surveys and evidence: Depending on the class, they gather measured surveys, structural reports, noise or flood assessments and daylight information, focusing only on the matters the council can assess.
- Drawings and submission: They prepare the plans, elevations and written statement the specific class requires, then submit the prior approval application with the correct forms.
- Determination period: The council consults neighbours and relevant bodies, then decides whether prior approval is required and, if so, whether it is given. Conditions can be attached.
- Building Regulations and completion: With approval in place, Building Regulations drawings follow before work starts. Some classes carry extra duties, such as telling the council when a larger home extension is finished.
What affects the cost
- Which permitted development class you’re using, since a home extension needs far less evidence than a barn or office conversion.
- How many homes a conversion would create, and how much layout design is needed to meet space standards.
- Whether specialist reports are needed on structure, noise, flooding, contamination, transport or daylight.
- The condition and history of the building, especially where past agricultural or commercial use has to be proved.
- Whether the council raises concerns that need a detailed response or a fresh submission.
Prior approval rules and limits
- The prior approval routes described here apply in England; Wales, Scotland and Northern Ireland have their own permitted development rules.
- Conservation areas, National Parks, National Landscapes and listed buildings are often excluded from these rights, or face extra limits.
- The matters assessed differ by class: a larger home extension looks at neighbours’ amenity, while conversions look at issues like transport, noise, flooding and light.
- Homes created through permitted development in England must meet nationally described space standards, and Building Regulations approval is still needed.
Questions people ask
Is prior approval the same as planning permission?
No. Prior approval is part of permitted development: the right itself grants permission, and the council only checks specific matters set out in the rules, such as noise, flooding or the impact on neighbours. It’s narrower than a planning application, but it only works if the proposal meets every condition of the permitted development class.
What is the neighbour consultation scheme for larger extensions?
In England, some houses can build a deeper single-storey rear extension than normal permitted development allows by notifying the council first. The council tells the adjoining neighbours, and if anyone objects it considers the effect on their amenity before deciding. It isn’t available everywhere, including in conservation areas, and you must tell the council when the extension is complete.
Can any barn be converted under Class Q?
No. The building must meet the rules on past agricultural use, and it has to be capable of conversion: the building works allowed are limited, and a scheme that amounts to rebuilding won’t qualify. In England, Class Q doesn’t apply to listed buildings or to buildings in conservation areas, National Parks, National Landscapes and some other protected areas. An early structural survey is usually the most important first step.
Can I convert my office or shop to flats without planning permission?
In England, Class MA allows many buildings in commercial, business and service use to become homes after prior approval, but not all qualify. Some councils have removed the right in parts of their area with an Article 4 direction, and the council can consider noise, flooding, transport, natural light and, in conservation areas, the loss of ground-floor commercial use.
What happens if the council doesn’t decide in time?
In England, if the council doesn’t notify you of its decision within the set period, the development can often go ahead. But this only protects a proposal that genuinely meets the permitted development rules; it won’t make a scheme that doesn’t qualify lawful. Take professional advice before relying on a missed deadline.
Available across the UK
Professionals cover the whole of the UK: England, Scotland, Wales and Northern Ireland. Planning and Building Regulations differ between the four nations, and your professional will work to the rules that apply where your property is.
- Get free quotes
- Rear Extensions
- Barn Conversions
- Commercial to Residential Conversions
- Roof Extensions and Adding a Storey
- Change of Use
- Conservation Area Projects
- Design and Access Statements
- Discharge of Planning Conditions
- Full Planning Applications
- Heritage and Conservation Architects
- Heritage Statements
- Householder Planning Applications
- All services
- Find your area