Archi Quote Compare

Get the right barn, stable or farm building designed and approved

Timber-clad farm barn with a large sliding door and a brick stable block with a horse looking out, hay bales and a tractor

For farmers, landowners and horse owners planning a new barn, livestock building, grain store, machinery shed or stables. Tell us about it and compare quotes from professionals who know farm buildings and the rules.

Farm buildings have to earn their keep. A livestock shed needs the right ventilation, drainage and handling routes, a grain store needs walls that can take the load, and a machinery shed needs doors wide and tall enough for modern kit. Stables and equestrian buildings bring their own needs for airflow, safe layouts and fire separation from hay and bedding. On the approvals side, many farm buildings in England can go ahead under agricultural permitted development after a prior notification to the council, while others need full planning permission. A good professional understands farming practice, picks a sensible site close to the existing farmstead, and can make a clear case for why the building is needed.

How a professional can help

Is this right for you?

How the project usually runs

What affects the cost

Permitted development and other rules for farm buildings

Questions people ask

Do I need planning permission for a new agricultural building?

Not always. In England, many farm buildings can be built under agricultural permitted development if the holding is large enough, the building is reasonably necessary for agriculture and it meets limits on size, height and location. You normally have to notify the council first, and it can ask to approve the siting and appearance. Rules differ in Scotland, Wales and Northern Ireland, so have a professional check your case.

Can I build stables on my land?

You’ll usually need planning permission, because keeping horses for leisure isn’t normally treated as agriculture. The council will look at the size and position of the stables, the effect on the landscape, access, manure storage and how much grazing land you have. Modest stables grouped with existing buildings, in materials that suit the area, are generally easier for a council to support.

What does a prior notification involve?

You tell the council about the building before you start, with a description, plans and details of the materials, and pay the application fee. The council then decides whether it wants to approve details such as siting, design and external appearance. Work shouldn’t start until that process allows it, so a clear, complete notification helps avoid delays.

Will my farm building need Building Regulations approval?

Often not, as many buildings used only for agriculture are exempt in England and Wales. The exemption has conditions, such as the building not being used as a dwelling or mainly for retail, packing or display, and not being close to buildings where people sleep. Buildings with other uses, such as a farm shop or office, may need approval, so check with building control before you build.

Could a new farm building be converted to a house later?

Don’t plan on it. Rules for converting farm buildings to homes are tight and differ across the UK, and in England a building put up under agricultural permitted development can face restrictions if its farming use ends. If you think you may want a different use in future, a professional can explain the options before you build.

Available across the UK

Professionals cover the whole of the UK: England, Scotland, Wales and Northern Ireland. Planning and Building Regulations differ between the four nations, and your professional will work to the rules that apply where your property is.