Archi Quote Compare

Find out if your walls and foundations can take another storey

Single-storey brick house on strip footings with a new light steel storey and roof going on top, a frame panel lifted in by a crane

Want a full extra floor on a house, bungalow or small building? Describe your property and compare quotes from structural engineers who investigate the existing structure and design the new floor, walls and roof.

Adding a storey puts a whole new floor of walls, floors and roof on a structure that was built for fewer. Before any design, an engineer needs to know what is already there: how the walls are built, how deep and wide the foundations are, what the ground is like and where the loads currently go. That investigation often decides the whole project. If the building can carry the extra weight, the engineer designs the new floor and roof, often in lightweight frame. If not, they set out the strengthening options, so you can decide what is practical.

How a professional can help

Is this right for you?

How the project usually runs

What affects the cost

Building control, planning and neighbours for an extra storey

Questions people ask

Do I have to rebuild the foundations?

Not always. Some foundations have spare capacity, especially when the new storey is in lightweight frame, while others need strengthening or underpinning. The only reliable way to know is to look: trial pits, then a comparison of the new loads with what the foundations and soil can carry. A feasibility check first can tell you before you pay for full design.

Why is a lightweight frame often used?

A timber or light steel frame weighs much less than brick or block walls, so the extra load on the existing walls and foundations is smaller, which can avoid or reduce strengthening. It also goes up quickly, shortening the time the roof is open. Sound, fire protection and appearance also count, and your designer and engineer will weigh them up.

How much will the investigation disturb my home?

A trial pit is a hole dug beside the wall and filled in afterwards, and openings in plaster or floors are kept small and made good. The engineer tells you what is needed and where. It is far less disruptive than finding a problem halfway through the build, and pits should be dug carefully and no deeper than the engineer asks. A pit close to a neighbour’s building can bring in the Party Wall etc. Act 1996 in England and Wales.

What if the investigation shows the walls can’t take another floor?

You still get useful information. The engineer can usually suggest options, such as strengthening the walls and foundations, a lighter frame or building over only part of the house. If none is practical, you will know before spending on planning and detailed design.

Should the structure be checked before the planning application?

It is not required, but it is wise for this project. Planning drawings come from your designer, but an early structural check stops you paying for drawings of a scheme the building can’t carry. Full structural design can follow once you know the idea is realistic.

Available across the UK

Professionals cover the whole of the UK: England, Scotland, Wales and Northern Ireland. Planning and Building Regulations differ between the four nations, and your professional will work to the rules that apply where your property is.